Event Summary
 
  FILE SAVED AS: MISO_3008_20210314_1100.htm  
 
 Incident:   MISO_3008_20210314_1100   Date:  03/14/2021 (CST)   Reliability Coordinator:  MISO 
 Initial Conditions:   N/A
 Flowgate:   3008 - Moberly_Overton_161kV_flo_Thom...   Rating:  0   LODF:   N/A
 TLR Direction:   Normal 
 Effective StartTime:   03/14/2021 11:00 (CST)   Effective EndTime:  03/14/2021 11:00 (CST)   TLR Duration:  0 Minutes
 
TLR Actions
 Confirm 
 Time 
 Level   Effective 
 Hour 
 Priority   Schedule   NNL Relief   Market Relief   Flow   Cont. 
 Flow 
 TLR Action Comments 
 Total Tags 
 Cut / Hold 
 IDC Cut   RC Cut 
 Acknowledge 
 Hold   CA   IDC 
 MW 
 RC 
 Ackn 
 MW 
 Type   Mkt   IDC 
 MW 
 RC 
 Ackn 
 MW 
 Current   Post 
 Cont. 
 MW   Relief   MW   Relief   MW   Relief 
Mar 14 
10:06 (CST) 
 TLR 3A 
 PRELIM 
 NEXT 
 1-NS 
 2-NH 
 6-NN 
 Total 
 1 / 0 
 1 / 0 
 4 / 0 
 6  /  0 
 55 
 14 
 376 
 445 
 3.5 
 0.9 
 20.7 
 25.0 
 0 
 0 
 0 
 0 
 0.0 
 0.0 
 0.0 
 0.0 
 0 
 0 
 0 
 0 
 0.0 
 0.0 
 0.0 
 0.0 
 NONE   NONE   0   N/A  N/A N/A
Mar 14 
10:10 (CST) 
 TLR 3B   CURRENT 
 1-NS 
 2-NH 
 6-NN 
 Total 
 2 / 0 
 2 / 0 
 4 / 0 
 8  /  0 
 86 
 45 
 308 
 1470 
 5.4 
 2.8 
 16.9 
 25.2 
 86 
 45 
 308 
 439 
 5.4 
 2.8 
 16.9 
 25.2 
 0 
 0 
 0 
 0 
 0.0 
 0.0 
 0.0 
 0.0 
 NONE   NONE   0   N/A  N/A N/A
 NEXT   NONE   NONE   NONE 
Mar 14 
10:41 (CST) 
 TLR 0   CURRENT   NONE   NONE   NONE   0   N/A  N/A N/A
 
TLR Schedule Totals
 Priority   Schedule 
 Total Tags 
 Cut / Hold 
 IDC Cut 
 MW 
 RC Cut 
 Acknowledge 
 MW 
 Hold 
 MW 
 0   0   0   0   0 
 1   3   141   86   0 
 2   3   59   45   0 
 3   0   0   0   0 
 4   0   0   0   0 
 5   0   0   0   0 
 6   8   684   308   0 
 7   0   0   0   0 
 Total   14   884   439   0